[Construction Case] Steel Pipe Pile Removal Work Using SR-45 Multi-Drill Excavator
Proven track record of handling various projects! Case study of the SR-45 multi-drill rig.
We would like to introduce a case study of underground obstacle removal conducted by our company. In Shibuya, Tokyo, we carried out the removal of steel pipe piles. We removed a steel pipe pile with a length of 15m that could not be extracted using the existing pile extraction method, utilizing the SR-45 multi-drill excavator. For more details about the case, please refer to the related link. 【Case Overview】 ■ Project Name: Removal of Steel Pipe Piles Using SR-45 Multi-Drill Excavator ■ Date of Construction: February 22, 2023 ■ Location: Shibuya, Tokyo *For more information, please download the PDF from the related link or contact us.